х
Отправьте свой запрос сегодня
Быстрая цитата

A Complete Guide to Steel Rolling Mills: What Every Steel Producer & Investor Should Know

If you are planning to set up a steel production facility, upgrade an existing plant, or invest in rolling mill equipment, this guide will walk you through everything you need to know — from basic principles to key equipment choices and project planning considerations. What Is a Steel Rolling Mill? […]

A Complete Guide to Steel Rolling Mills: What Every Steel Producer & Investor Should Know Продолжайте читать »

Comprehensive Guide to Pusher-Type Heating Furnace: Systems, Control, and Parameter Calculation

Comprehensive Guide to Pusher-Type Heating Furnace: Systems, Control, and Parameter Calculation

Introduction The pusher-type heating furnace is a critical piece of equipment in the steel rolling industry, designed to heat steel billets to the required temperature before they enter the rolling mill. This guide provides a detailed, factual overview of the pusher furnace based on standard training materials, covering its main

Comprehensive Guide to Pusher-Type Heating Furnace: Systems, Control, and Parameter Calculation Продолжайте читать »

Обязанности по управлению производственной безопасностью и выявлению опасностей на металлургических предприятиях

Safety Management Responsibilities and Hazard Identification in Steel Enterprises Abstract: An essential guide for metallurgical leaders on safety production duties, fund allocation, and the identification of major hazard sources in steel production facilities. я. Primary Safety Responsibilities of Corporate Leaders The main person in charge of a steel enterprise holds

Обязанности по управлению производственной безопасностью и выявлению опасностей на металлургических предприятиях Продолжайте читать »

Профессиональные рабочие процедуры по техническому обслуживанию центробежных насосов

Professional Operating Procedures for Centrifugal Pump Maintenance Ensuring operational stability and equipment longevity in metallurgical facilities. я. Pre-Operation and Startup Protocols 1. Pressure Verification: Ensure inlet pressure is greater than 1 бар (100kpa/0.1Mpa) before operation. 2. Power Check: Connect power and verify the motor rotation direction. 3. Valve Inspection: Check

Профессиональные рабочие процедуры по техническому обслуживанию центробежных насосов Продолжайте читать »

Укладка, Защита от коррозии и изоляция трубопроводов доменного газа

я. Gas Pipeline Laying 1. Gas pipelines should be equipped with anti-static and lightning grounding devices. The grounding resistance should not exceed 10Ω, and the flange connection resistance should be less than 0.03Ω. Testing should be conducted every six months. Grounding devices should be installed at the ends and bends

Укладка, Защита от коррозии и изоляция трубопроводов доменного газа Продолжайте читать »

Свяжитесь с нами сейчас, чтобы получить бесплатный дизайн и цитата

Прокрутите вверх